1st floor-   :
- Implementation of elastomeric insulation of fresh and outgoing air channels
- Installation of fresh and exhaust air channels
- Implementation of elastomeric insulation of the 5-layer pipe system
- Implementation of water supply system piping (galvanized pipe)
- Implementation of piping system of 5-layer pipes
- Installation of return and exhaust air channels
- Implementation of medical gas system pipe
- Implementation of medical gas system valve box
- Implementation of cable tray
- Implementation of pipes and cans of switches and sockets

Floor 2+:
- Installation of channel risers and positive pressure of the staircase

Floor 4+:
- Implementation of elastomeric insulation of the water supply system (galvanized pipe)
- Installation of manual dampers and fire ducts
- Installation of manual dampers and return channel fire

Floor 5+:
- Installation of support and implementation of fresh air channels
- Implementation of elastomeric insulation of the water supply system (galvanized pipe)
- Installation of manual dampers and return channel fire
- Implementation of wiring (lighting system)

Floor 7+:
- Implementation of pipes and cans of switches and sockets
- Implementation of wiring (Prisbarg system)
- Implementation of cabling (network system)
- Installation of return and exhaust air channels
- Installation of channel risers and positive pressure of the staircase
- Implementation of elastomeric insulation of the water supply system (galvanized pipe)
- Implementation of the sprinkler system pipe
- Installation of manual dampers and fire ducts

Floor 17+:
- Construction of fresh air channel and south exhaust zone
- Installation of fresh air channel and exhaust zone in the south (west to east) of the floor
- Installation of support and implementation of sprinkler piping in the corridor of the southern zone
- Implementation of the electric tray of the corridor of the southern zone
- Implementation of sewage piping services in the corridor of the southern zone
- Implementation of galvanized piping services in the corridor of the southern zone
- Implementation of five-layer pipes of the southern zone corridor services
- Installation of support and implementation of sprinkler piping in the western part of the south zone
- Implementation of sewage piping in the wet area of the western part of the south zone
- Implementation of galvanized piping of the wet area in the western part of the southern zone
- Implementation of five-layer wet space pipes in the western part of the southern zone
- Flooring of the wet area in the western part of the south zone
- Installation of support and implementation of sprinkler piping in the southern zone
- Implementation of sewage piping in the wet area of the southern part of the southern zone
- Implementation of galvanized piping of the wet area in the southern part of the southern zone
- Implementation of five-layer wet space pipes in the southern part of the southern zone
- Flooring of the wet area in the southern part of the southern zone
- Implementation of electric pipe on the wall of the dry space in the southern part of the southern zone
- Installation of support and implementation of sprinkler piping in the northern part of the southern zone
- Implementation of sewage piping in the northern part of the wet area in the southern zone
- Implementation of galvanized piping of the wet area in the northern part of the southern zone
- Implementation of five-layer wet space pipes in the northern part of the southern zone
- Flooring of the wet area in the northern part of the southern zone
- Installation of support and implementation of sprinkler piping in the eastern part of the south zone
- Implementation of the electric pipe of wet space in the eastern part of the south zone
- Implementation of sewage piping in the wet area of the eastern part of the south zone
- Implementation of galvanized piping of the wet area in the eastern part of the south zone
- Implementation of five-layer wet space pipes in the eastern part of the southern zone
- Flooring of the wet area in the eastern part of the south zone

Floor 19+:
- Installation of electric pipe on the walls of dry spaces of A7 offices
- Implementation of electric pipe under the ceiling of the dry space of office B1, b2 and b9
- Implementation of electrical pipes under the roof of the dry space of C1, C2, C3 and C10 offices
- Implementation of electric pipe under the roof of dry spaces of offices A4, A6 and A9
- Implementation of electric pipe in the wet area of office B3 to B5 and B9
- Implementation of electric pipe in the wet space of the office C8
- Implementation of electrical pipes in the wet spaces of A4 offices
- Implementation of electrical pipes in the wet spaces of A7 offices
- Wiring and installation of switches and sockets in the office B1 to B10
- Wiring and installation of the key and socket of the office C1 to C4 and C6-C8 to C10
- Wiring and brain installation of A10 offices
- Implementation of the electric pipe in the corridor of the western zone
- Implementation of the electric pipe of the corridor services in the western zone
- Installation of the exhaust channels of the corridor services in the western zone
- Installation of the valve of the service channel of the corridor of the western zone
- Installation of support and implementation of sprinkler piping in the southern zone
- Implementation of the electricity pipe of the South Zone Corridor services
- Installation of eastern zone channels
- Implementation of the electric pipe in the corridor of the eastern zone
- Implementation of electrical wiring in the corridor of the eastern zone
- Implementation of electrical tray in the corridor of the eastern zone